Valuation is done as soon as lot is create. Inspection is assumed to be successful and its then checked whether a stage is required or not
If at UD the lot is rejected, the system then records an unsuccessful inspection
DMR at UD :
the stage change is decided based on the UD taken
In most of the cases, DMR at UD is preferred